Page: 1 | Rating: Unrated [0] |
Calendar Changes
Good [+1]Toggle ReplyLink» Nuclear a répondu le Fri 11 Apr, 2003 @ 7:01pm |
Now if a party is more than one date, the 2nd and 3rd days will be linked to the first day of the event... This way people only need to write in the information once...
I'll setup the admin to be able to do this automatically... For now I have edited the multiple day events to do this automatically... |
Calendar Changes
Page: 1 |
[ Haut de la page ] |
Poster Une Réponse |
Vous devez être connecté pour soumettre une réponse.
[ Haut de la page ] |